Extradosed Bridge having length 6812.5 mtrs. Proof Checking for Construction of New 2-Lane Major ExtradosedBridge having length 6812.5 mtrs.including approaches overBrahmaputra River betweenMajuli on North…
SIGNATURE CABLE STAYED BRIDGE, DELHI
“Signature Bridge” Length of Bridge – 675m having 251m main Cable Stay and 36m span 2nos Detailed Design for Constructionof (Signature Bridge) CableStayed Bridge at…
BRIDGE NO. 20 STEEL TRUSS, UDHAMPUR, J&K
Bridge Consists of Superstructure 2 Span of 154 m each in structural steel Detailed Design for Constructionof Bridge 20 having 2 span of 154m each…
