BRAHMAPUTRA RIVER BRIDGE ASSAM

Extradosed Bridge having length 6812.5 mtrs.

Proof Checking for Construction
of New 2-Lane Major Extradosed
Bridge having length 6812.5 mtrs.
including approaches over
Brahmaputra River between
Majuli on North Bank and Jorhat
on South Bank from Km. 11.690
To Km. 19.715″ in Assam.
Client : UP State Bridge Corpn.
Consultancy Cost : Rs. 400 Lakh
Project Cost : Rs. 925 Crore
Description of Project :
Extradosed Bridge having length
6812.5 m. Viaduct Portion = 810m

  • 1000m = 1.81 km 4 Span
    Continuous = 3 Main Span + 2
    Back Span = 580m 3 Span
    Continuous = 2 Main Span + 2
    Back Span = 460m Type of
    foundation = Well foundation. The
    carriageway width is 7.5m.

Leave a Reply

Your email address will not be published. Required fields are marked *