New 4-lane Extradosed Bridge (Parallel to the Existing Vikramshila Setu) across river Ganga, Bihar Client : S.P. Singla Constns. P. Ltd.Consultancy Cost : Rs. 175…
BHAGAT SINGH NAGAR ACROSS GOREGAON CREEK
Bridge length 2 x 56m + 1 x 120m =232m&42m Detailed Design for Constructionof Vehicular Bridge behindBhagat Singh Nagar acrossGoregaon Creek along 36.6mwide D.P. Road…
Ambhora Cablestayed Bridge of span 700 mtrs in 2 modules
Proof Consultancy Services for
the proposed construction of
Major High-Level Bridge across
Wainganga river at Ambhora on
Khapri Pachgaon Kuhi Ambhora
to Bhandara Road, Nagpur.
Client : T&T Infra Ltd.
Consultancy Cost : Rs. 55 Lakh
Project Cost : Rs. 127.54 Crore
Description of Project : Five Span
Ambhora Cablestayed Bridge of
span 700 mtrs in 2 modules. The
Pylon P3 (Centre Pylon) has a
viewing gallery at 30m height. The
Carriageway width is 7.5 mtrs.
AMBHORA CABLE STAYED BRIDGE, NAGPUR
Ambhora Cablestayed Bridge of span 700 mtrs in 2 modules Proof Consultancy Services forthe proposed construction ofMajor High-Level Bridge acrossWainganga river at Ambhora onKhapri Pachgaon…
EXTRADOSED BRIDGE, MANIHARI SAHIBGANJ
6 kilometre long Ganga Bridge world’s third-longest Extradosed Bridge. Parallel Checking of Design &Drawings & Value Engineeringfor Construction of New Link NH133 (Km 200.700 of…
BHARAT BANDANA CABLE STAYED FOB, DELHI
Spreaded over 1200 m in Length cables from Pylon Structure Terrain. Proof Checking for PylonStructure, Diagrid and CableStayed Bridge Structure atBharat Vandana Park, Sector-20Dwarka, Delhi.Client…
TAPOLA CABLE STAYED BRIDGE, SATARA
Bridge of 540m in 3 modules. Proof Checking for the ProposedConstruction of Cable StayedMajor Bridge on KumbharoshiKalamgaon Tapola Ahir RoadMDR.17 at km.55/900, in BackWater of…
