TAPOLA CABLE STAYED BRIDGE, SATARA

Bridge of 540m in 3 modules.

Proof Checking for the Proposed
Construction of Cable Stayed
Major Bridge on Kumbharoshi
Kalamgaon Tapola Ahir Road
MDR.17 at km.55/900, in Back
Water of Koyana Dam ( Tapola to
Ahir ), Tal. Mahabaleshwar, Dist.
Satara.
Client : T&T Infra Ltd.
Consultancy Cost : Rs. 55 Lakh
Project Cost : Rs. 134.75 Crore
Description of Project : The
proposed Bridge consists 3-
span Cable-stayed Bridge of
540m in 3 modules. The Pylon
P2 (Centre Pylon) has a Viewing
Gallery Height at 35m above
Deck. The carriageway width is
about 7.5m

Leave a Reply

Your email address will not be published. Required fields are marked *