Spreaded over 1200 m in Length cables from Pylon Structure Terrain.
Proof Checking for Pylon
Structure, Diagrid and Cable
Stayed Bridge Structure at
Bharat Vandana Park, Sector-20
Dwarka, Delhi.
Client : NBCC
Consultancy Cost : Rs. 55 Lakh
Project Cost : Rs. 200 Crore
Description of Project : The
Proposed Cable Stayed FOB
Consists Unique Form of Metal
Bridge (3.5 + width of counter
balance section mtr width)
Spreaded over 1200 m in Length
suspended with cables from
Pylon Structure Terrain.
