Total Length of Cable Stayed Bridge 250m.
Detailed Project Report including
Detailed Design & Drawings,
BOQ and Estimates for Cable
Stayed Bridges across Govind
Sagar Lake on SawarghatKairyan Bagchhal Road in
District Bilaspur.(H.P)
Client : HP PWD, Bilaspur
Consultancy Cost : Rs. 56.4 Lakh
Project Cost : Rs. 350 Crore
Description of Project : Work
includes analysis Feasbility
Report, Detailed Engineering
Preparation of Design and
Drawings, Cost Estimates, BOQ
& Tender Document. Total
Length of Cable Stayed Bridge
250m.
